Rural Fire Service Strategic Planning Committee
Meeting Date: Thursday, 15 February, 2018
Location: Council Chambers, City Administrative Centre, Bridge Road, Nowra
Time: 6.00pm
Please note: Council’s Code of Meeting Practice permits the electronic recording and broadcast of the proceedings of meetings of the Council which are open to the public. Your attendance at this meeting is taken as consent to the possibility that your image and/or voice may be recorded and broadcast to the public.
Agenda
1. Apologies
2. Confirmation of Minutes
· Rural Fire Service Strategic Planning Committee - 30 November 2017..................... 1
3. Reports
RF18.1........ RFS Infrastructure Preface........................................................................... 11
RF18.2........ Other RFS Infrastructure Projects................................................................ 13
RF18.3........ Kangaroo Valley Station Additions............................................................... 16
RF18.4........ Shoalhaven Heads Extensions.................................................................... 18
RF18.5........ Kioloa Station Extensions............................................................................. 20
RF18.6........ IEMC "Pad Mount" Transformer................................................................... 22
RF18.7........ Tabourie Station Extensions........................................................................ 23
RF18.8........ Broughton Vale / Berry Rural Fire Station.................................................... 24
RF18.9........ Currarong Station Additions......................................................................... 73
4. General Business
RF18.10...... Work Health & Safety (WH&S)
RF18.11...... Code of Conduct
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page ii |
Membership
Clr Mitchell Pakes – Chairperson
Clr Mark Kitchener
Clr Jo Gash
Mr Russ Pigg or nominee (Mr Paul Keech)
Mr Mark Williams
Mr Paul Gooey
Ms Jennifer Lawther (Alternate TBA)
Mr Andrew Fielding (Alternate – Mr Bob Johnston)
Mr Vic Walker (Alternate – Ms Jacqui Cox)
Mr Martin Gaffey (Alternate – Mr Ron Rollinson)
Mr Paul Gleeson (Alternate – Mr Geoff Phillips)
Mr John Ashton (Alternate – TBA)
Mr Bill Bean (Alternate – TBA)
Mr Chris Baseler or nominee
Quorum - Five (5)
Objectives:
To advise Council on issues of a strategic and policy nature relating to the operation of the Rural Fire Services having regard to the following:
· That the core communication between brigades and Fire Control Officer on operational issues be raised through the Group Officers utilising the committee structure.
· All issues be raised through Fire Control so that statutory matters can be resolved immediately.
· Policy matters raised can be referred to the Strategy and Assets Committee through the General Manager so that statutory matters can be resolved.
· That the Strategic Planning Committee be developed as the body advising Council on Rural Fire Service policy issues
Minutes of the Rural Fire Service Strategic Planning Committee
Meeting Date: Thursday, 30 November 2017
Location: Council Chambers, City Administrative Centre, Bridge Road, Nowra
Time: 6.00pm
The following members were present:
Clr Mitchell Pakes - Chairperson
Clr Mark Kitchener
Mr Mark Williams – District Manager, Shoalhaven Rural Fire Service
Mr Paul Gooey
Ms Jennifer Lawther
Mr Andrew Fielding
Mr Martin Gaffey
Mr Paul Gleeson
Mr John Ashton
Mr Peter Knill – Acting Director Assets & Works
Others present:
Clr Patricia White
Ms Megan Birmingham – Shoalhaven City Council
Ms Lynda Ho – Shoalhaven City Council
Mr Michael Strachan – Shoalhaven City Council
Apologies / Leave of Absence |
Apologies were received from Messrs Bill Bean, Paul Keech, Ron Rollinson and Vic Walker.
The Committee welcomed Clr Mitchell Pakes, incoming Chairperson and Mr Peter Knill, Acting Director, Assets & Works (for Mr Paul Keech).
At its meeting on 29 September 2017, Council appointed Clr Mitchell Pakes (Chairperson), Clr Joanna Gash and Clr Mark Kitchener to the Committee.
Confirmation of the Minutes |
RESOLVED (Andrew Fielding / Paul Gooey) That the Minutes of the Rural Fire Service Strategic Planning Committee held on Thursday 11 May 2017 be confirmed. CARRIED
|
Declarations of Interest |
Clr Mitchell Pakes – All reports – significant non pecuniary interest declaration – Member of the RFS – remained in the room and did not take part in discussion or vote.
Reports
General Business
RF17.36 Code of Conduct |
HPERM Ref: D17/360291 |
|
RF17.37 Work Health & Safety (WHS) |
HPERM Ref: D17/360307 |
|
RF17.39 Additional Item - Representation - Drawing Room Rocks - Walking Track |
At a recent meeting attended by the Fire Control Officer, the land owner adjoining the track to Drawing Room Rocks had raised concerns in relation to: the number of visitors, the inadequacy of the parking and the potential for impeded vehicular access in the event of an emergency. The land owner may be willing to give Council a parcel of land to ease the parking congestion.
|
RF17.40 Additional Item - Emergency Operations Centre Meeting Room |
The new Emergency Operations Centre meeting room (except for the fit out) had been paid for by the Rural Fighting Fund. It appeared that Council was restricting access to this room unless this was cleared by the LEMO. It was queried why the new room was not being used in the same manner as its predecessor as there had been no change in philosophy behind the room use. The room needed to be available to all emergency services. |
RESOLVED (Mark Williams / Paul Gooey) That Council restore the former booking system/regime for the EOC meeting room. CARRIED
|
Addendum Reports
There being no further business, the meeting concluded, the time being 7.00pm.
Clr Mitchell Pakes
CHAIRPERSON
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 11 |
RF18.1 RFS Infrastructure Preface
HPERM Ref: D18/35250
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Recommendation (Item to be determined under delegated authority) That the Committee receives the report for information
|
Details
The below table shows the current Infrastructure component of the Strategic Capital Expenditure Program (SCEP). This table is detailed in order of funding allocated and priorities as to these and future. (These priorities may change from time to time as required.)
It should be noted that changes to the RFS policy, now sees projects being funded in a maximum of two stages, being:
1. the allocation of ‘seed’ or preparatory funding for costs encountered during the planning phase (reports, plans, consultants etc)
2. the allocation of full cost to complete the project based on quantity cost estimates.
# |
PROJECT NAME |
ALLOCATED |
COST EST |
SHORTFALL |
1 |
Kangaroo Valley ablutions/extension |
$ 600,000 |
580,000 |
nil |
2 |
Shoalhaven Heads extension |
$ 671,028 |
675,272 |
nil |
3 |
Kioloa Station extension |
$ 370,000 |
371,876 |
nil |
4 |
IEMC Pad Mount Transformer |
$ 165,000 (RFS) $ 135,000 (SCC) |
300,000 |
nil |
5 |
Milton Station extension |
$ 35,000 |
35,000 |
nil |
6 |
Tabourie Station extension |
$ 27,000 |
490,544 |
463,544 |
7 |
Broughton Vale Station (new) |
$ 50,000 |
1,341,000 |
1,291,000 |
8 |
Currarong Station extension |
$ |
U/K |
TBA |
9 |
Conjola station extension |
$ |
U/K |
TBA |
10 |
Wandandian station extension |
$ |
U/K |
TBA |
11 |
Basin View station extension |
$ |
U/K |
TBA |
12 |
Huskisson station extension |
$ |
U/K |
TBA |
13 |
Beaumont station extension |
$ |
U/K |
TBA |
14 |
Manyana Satellite garage & Main Stn alterations |
$ |
U/K |
TBA |
15 |
Training, Logistics, SMSS Facility (TLSF) (new) |
$ |
9,450,000 |
9,450,000 |
|
TOTALS |
$2,053,028 |
$13,243,692 |
$11,204,544 |
All of these are in various forms of completion, from seed/investigation/planning, through to construction. As shown above, some have funding allocated and are listed as committed projects.
Note: Other projects listed will be bid for in following years estimates or at other times as required. It should be noted that in relation to project #15 other external RFS sections (SMSS & State Logistics) will be housed in the proposed facility and therefore these sections will be expected to contribute to the cost.
Each of these items is dealt with separately.
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 13 |
RF18.2 Other RFS Infrastructure Projects
HPERM Ref: D18/35321
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Recommendation (Item to be determined under delegated authority) That the Committee receives the report for information
|
Details
1. Milton/Catering Station extensions
Current budget allocated $ 35,000.00
Cost estimate of project: $ 35,000.00
Variance: $ nil
The expenditure of these funds is all but complete with some painting still outstanding.
Once completed reimbursement claim will be submitted to RFS Region ASAP.
2. Conjola Station extensions
Current budget allocated: $
Cost estimate of project: $ U/K
Variance: $TBA
No funding is currently allocated to this project.
Consideration will be given to seeking seed funding for this project to DA stage in a future budget
This project remains within the Shoalhaven Strategic Capital Expenditure Program (SCEP) and as such will remain on the DM SPC report.
3. Wandandian station extensions
Current budget allocated: $
Cost estimate for project: $U/K
Variance: $TBA
No funding is currently allocated to this project.
Consideration will be given to seeking seed funding for this project to DA stage in a future budget
This project remains within the Shoalhaven Strategic Capital Expenditure Program (SCEP) and as such will remain on the DM SPC report.
4. Basin View Station extensions
Current budget allocated: $
Cost estimate for project: $U/K
Variance: $TBA
No funding is currently allocated to this project.
Consideration will be given to seeking seed funding for this project to DA stage in a future budget
This project remains within the Shoalhaven Strategic Capital Expenditure Program (SCEP) and as such will remain on the DM SPC report.
5. Huskisson Station extensions
Current budget allocated: $
Cost estimate of project: $U/K
Variance: $TBA
No funding is currently allocated to this project.
Consideration will be given to seeking seed funding for this project to DA stage in a future budget
This project remains within the Shoalhaven Strategic Capital Expenditure Program (SCEP) and as such will remain on the DM SPC report.
6. Beaumont Station extensions
Current budget allocated: $ 0.00
Cost estimate of project: $U/K
Variance: $TBA
No funding is currently allocated to this project.
Consideration will be given to seeking seed funding for this project to DA stage in a future budget
This project remains within the Shoalhaven Strategic Capital Expenditure Program (SCEP) and as such will remain on the DM SPC report.
7. Manyana Satellite garage & Main Stn Alterations
Planning works for the two Brigade facilities will be undertaken as soon as funding can be secured through the RFFF, in line with District priorities.
8. Training/Logistics/SMSS Facility (TLSF)
Current budget allocated $
Cost estimate of project: $9,500,000.00
Variance: $9,500,000.00
Nothing new to report.
RFS Infrastructure Management (Sydney) has not progressed the issue.
This project is now on hiatus whilst other Infrastructure works are occurring. The District (when able), will formalise the project proposal documentation which including all plans and costings undertaken to date and officially resubmit through Region and Head Office.
9. 2018/19 RFFF Estimates
The 2018/19 RFFF Estimates are now being compiled.
This is the second year of the amended estimate and allocation process.
This will see the amount of required contribution by Council fixed to a percentage of the total Rural Fire Fighting Fund (RFFF). Council’s mandatory contribution percentage has been advised as 2.664%.
It is hoped that the District will be successful in obtaining further infrastructure funding this coming year. However, ongoing delays in expending current and previous allocations may again have a detrimental effect on this.
The $300,000 bid for the new “Pod” Logistics vehicle will again be included into the bid.
10. Staff Movements
Since last report, Mr Joshua Gregory has taken up ongoing employment to the OPO1 position vacated by James Morris.
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 16 |
RF18.3 Kangaroo Valley Station Additions
HPERM Ref: D18/35438
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Details
Current budget allocated: $400,000.00
Cost estimate of project: $637,676.00
Variance: $237,676.00
Since last report, the DA has now been approved. Funding for the shortfall/variance ($238K) has been identified and put in place.
Despite assurances that the Tenders for this (and projects 2&3) would be advertised prior to Christmas 2017, this did not occur. Council’s Project Manager advised RFS against advertising tenders so close to Christmas due to danger of not reaching all companies because of the Construction Industry Holiday period close down.
Assurances were provided that the tenders would be advertised in the 2nd half of January.
During this period, the DM was requested to provide information confirming adequate funds for each project subject to tender. This was provided to Council on at least two occasions prior to Christmas.
Alarmingly, in the last week of January the tenders still had not been advertised. Since then, the DM has met with Mr Paul Keech and subsequently Mr Tom Dimec in another effort to rectify this matter with urgency. RFS has received another assurance that the tenders will be let on Fri 2.2 or Mon 5.2.18
As a result of this inaction, RFS District has been reprimanded by Head Office in regard to the tenders not being advertised in January as was assured.
It cannot be stressed highly enough how serious the situation is with this funding.
Any further delays in management of this project is likely to see allocated funding withdrawn. Council has been warned of this possibility on numerous occasions both via this committee and during direct meetings with senior staff, the General Manager and Councillors. Should this occur, it will not only jeopardise this project, but also potentially impact any future funding bid by Shoalhaven for Infrastructure projects.
It is in Council’s best interest to secure as much funding allocations as possible. To not capitalise on this would not see a reduction of Council’s contribution to the RFFF, and will also result in no provision of upgraded facilities/infrastructure for the 1,800 volunteer members of the District RFS Brigades and the communities in which they serve.
*****
Director Assets and Works Recommendation
That the Committee note that;
1. Tenders for the construction of the Kangaroo Valley RFS Station Extension have been called and the closing date for submissions is 6 March 2018.
2. The NSWRFS will be involved in the Contractor Selection process and invited to Project Manage the works (via the NSW Department of Public Works) so the project can be completed as per the NSWRFS requirements
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 18 |
RF18.4 Shoalhaven Heads Extensions
HPERM Ref: D18/35452
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Details
Current budget allocated: $671,028.00
Cost estimate of project: $675,272.00
Variance: $ 0.00
Since last report, the DA has now been approved. Funding transfers for the previous variance ($275K) has now occurred.
Despite assurances that the Tenders for this (and projects 2&3) would be advertised prior to Christmas 2017, this did not occur. Council’s Project Manager advised RFS against advertising tenders so close to Christmas due to danger of not reaching all companies because of the Construction Industry Holiday period close down.
Assurances were provided that the tenders would be advertised in the 2nd half of January.
During this period, the DM was requested to provide information confirming adequate funds for each project subject to tender. This was provided to Council on at least two occasions prior to Christmas.
Alarmingly, in the last week of January the tenders still had not been advertised. Since then, the DM has met with Mr Paul Keech and subsequently Mr Tom Dimec in another effort to rectify this matter with urgency. RFS has received another assurance that the tenders will be let on Fri 2.2 or Mon 5.2.18
As a result of this inaction, RFS District has been reprimanded by Head Office in regard to the tenders not being advertised in January as was assured.
It cannot be stressed highly enough how serious the situation is with this funding.
Any further delays in management of this project is likely to see allocated funding withdrawn. Council has been warned of this possibility on numerous occasions both via this committee and with Direct meetings with senior staff, the General Manager and Councillors. Should this occur, it will not only jeopardise this project, but also potentially impact any future funding bid by Shoalhaven for Infrastructure projects.
It is in Council’s best interest to secure as much funding allocations as possible. To not capitalise on this would not see a reduction of Council’s contribution to the RFFF, and will also result in no provision of upgraded facilities/infrastructure for the 1,800 volunteer members of the District RFS Brigades and the communities in which they serve.
*****
Director Assets and Works Recommendation
That the committee note that;
1. Tenders for the construction of the Shoalhaven Heads RFS Station Extension have been called and the closing date for submissions is 6 March 2018.
2. The NSWRFS will be involved in the Contractor Selection process and invited to Project Manage the works (via the NSW Department of Public Works) so the project can be completed as per the NSWRFS requirements
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 20 |
RF18.5 Kioloa Station Extensions
HPERM Ref: D18/35469
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Details
Current budget allocated: $370,000.00
Cost estimate for project: $371,876.00
Variance: $nil
Since last report, the DA has now been approved. Funding transfers for the previous variance ($187K) has now occurred.
Despite assurances that the Tenders for this (and projects 2&3) would be advertised prior to Christmas 2017, this did not occur. Council’s Project Manager advised RFS against advertising tenders so close to Christmas due to danger of not reaching all companies because of the Construction Industry Holiday period close down.
Assurances were provided that the tenders would be advertised in the 2nd half of January.
During this period, the DM was requested to provide information confirming adequate funds for each project subject to tender. This was provided to Council on at least two occasions prior to Christmas.
Alarmingly, in the last week of January the tenders still had not been advertised. Since then, the DM has met with Mr Paul Keech and subsequently Mr Tom Dimec in another effort to rectify this matter with urgency. RFS has received another assurance that the tenders will be let on Fri 2.2 or Mon 5.2.18
As a result of this inaction, RFS District has been reprimanded by Head Office in regard to the tenders not being advertised in January as was assured.
It cannot be stressed highly enough how serious the situation is with this funding. Any further delays in management of this project is likely to see allocated funding withdrawn. Council has been warned of this possibility on numerous occasions both via this committee and with Direct meetings with senior staff, the General Manager and Councillors. Should this occur, it will not only jeopardise this project, but also potentially impact any future funding bid by Shoalhaven for Infrastructure projects.
It is in Council’s best interest to secure as much funding allocations as possible. To not capitalise on this would not see a reduction of Council’s contribution to the RFFF, and will also result in no provision of upgraded facilities/infrastructure for the 1,800 volunteer members of the District RFS Brigades and the communities in which they serve.
Director Assets and Works Recommendation
That the committee note that;
1. Tenders for the construction of the Kioloa RFS Station Extension have been called and the closing date for submissions is 6 March 2018.
2. The NSWRFS will be involved in the Contractor Selection process and invited to Project Manage the works (via the NSW Department of Public Works) so the project can be completed as per the NSWRFS requirements
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 22 |
RF18.6 IEMC "Pad Mount" Transformer
HPERM Ref: D18/35563
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Recommendation (Item to be determined under delegated authority) That Council expedite the supply of required documents and information so that a reimbursement claim can be compiled and processed.
|
Details
Current budget allocated: $165,000.00 (RFFF) & $135,000 (SCC)
Cost estimate of project: $300,000.00
Variance: $0.00
Site works on this project are continuing. The project is behind schedule due to delays involving contractor machinery and Integral Electricity regarding “cut over”.
Council Project Management has advised that with no further delays expected, the project should be complete by end Feb ‘18
Repeated requests have been made for Council to supply documents and information required so that reimbursement of the allocated funds can be made ASAP.
*****
Director Asset and Works Recommendation
That the Committee note that invoices for this project will be forwarded once Council’s Finance Section have completed the Council Budget December Quarterly Review responsibilities.
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 23 |
RF18.7 Tabourie Station Extensions
HPERM Ref: D18/35590
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Details
Current budget allocated $ 27,000.00
Cost estimate of project: $498,593.00
Variance: $471,593.00
No further information on the status of this project has been received from Council since last report.
Once the DA is approved (subsequent to land approval issue being resolved), the District Manager will be in a position to request funding for the shortfall in project cost.
*****
Director Assets and Works Recommendation
That the committee note;
1. that the Development Application for the Tabourie RFS Station Extensions has been stalled due the inability to obtain “Owners Consent” from Crown Lands. The existing RFS station is inconsistent with the reserve purpose (public recreation) and thus under the Native Title Act the existing use is invalid and has not extinguished native title. The Extinguishment of Native Title is not a certainty and this process could take 6 to 12 months to work through.
2. The cost to make a Non-Claimant Native Title Application and pay compensation to the Native Title Landholders if any, is to be met by Council initially and there is currently no budget for this work.
3. This cost would not be incurred if the station remains as is, therefore Council would seek assurances that these costs would be include in the project cost and thus reimbursed by the RFS, before any further work is undertaken in relation to extinguishing Native Title. An estimate of the cost of this process is being prepared for a future committee meeting.
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 24 |
RF18.8 Broughton Vale / Berry Rural Fire Station
HPERM Ref: D18/35613
Submitted by: The Fire Control Officer, The Superintendent Mark Williams
Attachments: 1. Preliminary Concept Plans ⇩
2. MI Engineers cost estimate ⇩
3. WT Partnership cost estimate ⇩
4. Concept Cost Estimate ⇩
Details
Current budget allocated $50,000.00
Cost estimate of project (approx.) $1,341,000.00
Variance $1,291,421.00
Last meeting saw a resolution seeking Council to review this project with view to its capacity to commit to funding the $429,000 of civil works required for this project. To date, no advice on this matter has been received.
Council did advise that the alternative sites listed in last report were unlikely to be any cheaper to acquire or construct on for various reasons including:
· Cost of undertaking separate investigations
· Potential cost of acquisition
· Distance between proposed sites and services required (power, water, sewer etc.)
*****
Director Assets and Works Recommendation
That the committee;
1. endorse the set of drawings Plan Reference 5420 as the preferred concept design for the new Broughton Vale / Berry Rural Fire Services Station noting the estimated construction costs, based on the concept design, is $1,350,000 (exc GST).
2. Note that Council has progressed the Road Closure to create the Lot upon which this station will be built and an application to register the Deposited Plan has been made to the Land Titles Office. The Gazettal process will follow the Registration process.
3. note that Council does not subsidise the State Budget by making additional contributions to the provision of NSWRFS facilities, and a deviation from this practice would require a resolution of the Council.
4. supports the NSWRFS Shoalhaven District Manager applying to the NSWRFS for funding for the new Broughton Vale / Berry Rural Fire Services Station project in the 2018/19 RFFF estimates to bring the project to fully costed, construction ready status.
5. when funding is available the NSWRFS engages the NSW Department of Public Works as the Principle Contractor/Consultant for new Broughton Vale / Berry Rural Fire Services Station project, with Council assisting to have the project considered under the Infrastructure SEPP, if required.
|
Rural Fire Service Strategic Planning Committee – Thursday 15 February 2018 Page 73 |
RF18.9 Currarong Station Additions
HPERM Ref: D18/35631
Submitted by: The Fire Control Officer, Superintendent Mark Williams
Details
Current budget allocated $0.00
Cost estimate of project: $ U/K
Variance: $ TBA
Concept Plans have been received from the architect. These have been endorsed by the Brigade. As per last meeting report and outcomes, previously allocated funds have been journaled to other projects.
Seed funding, sufficient to permit the project to be planned through to fully costed DA approval will be bid for in the 2018/19 estimates – providing Council can commit to staffing and achieving same within 12 months of allocation.
*****
Director Asset and Works Recommendation
That;
1. the Committee supports the NSWRFS Shoalhaven District Manager applying to the NSWRFS for seed funding for the Currarong Station Additions project in the 2018/19 RFFF estimates to bring the project to fully costed, construction ready status
2. when funding is available, the NSWRFS engages the NSW Department of Public Works as the Principle Contractor/Consultant for Currarong Station Additions project, with Council assisting to have the project considered under the Infrastructure SEPP, if required.